Electricians dispatched to repair high voltage wire to ensure post-holiday travel peak in China's Wuhan

Source: Xinhua| 2019-02-24 07:21:07|Editor: Li Xia
Video PlayerClose

CHINA-WUHAN-ELECTRICIAN-RUSH REPAIR (CN)

Wan Fei, 40, the head of the inspection team from the Wuhan Power Supply Company under State Grid Corporation, walks through a muddy road in the mountain area of Wuhan, capital of central China's Hubei Province, Feb. 12, 2019. A team of electricians was dispatched to repair a high voltage wire that was broken due to thick layer of ice accumulation. After one day's work on the over 40-meter-high power transmission tower in bad weather condition, the team succeeded in fixing the failed power system that lowered the trains' speed causing delay during the post-holiday travel peak. This year's Spring Festival travel rush started on Jan. 21 and will last till March 1, with railway trips expected to hit 413 million in total, up 8.3 percent. (Xinhua/Xiao Yijiu)

   Prev 1 2 3 4 5  

KEY WORDS:
EXPLORE XINHUANET
010020070750000000000000011100001378454891
国产无码在线观看免费在线,37pao国产成视频,日韩一区二区视频在线,国产国产人免费人成免费视频麻豆
亚洲欧美国产制服日本一区二区 | 亚欧日韩欧美网站在线看 | 亚洲欧美日韩综合一区二区 | 亚洲国产精品综合久久网络 | 一区二区三区视频日本精品 | 在线点播日韩欧美精品 |